Production planning

How a project order moves through the plant

Cable for a renewable project is usually a scheduled supply, not a stock item. The sequence below is what we agree with the contractor before the first drum is built.

1 · Drawing approval

Conductor, insulation, screen, armour, sheath and marking are fixed on an order drawing. Nothing is released to production until the contractor confirms it.

2 · Production slot

Stranding, insulation, cabling, armouring and sheathing run in sequence on in-house lines, so a partial delivery can be planned around the site programme.

3 · Test and release

Routine tests are run on the finished length, the report is matched to the drum number, and the reel is packed for export.

4 · Delivery

Drum layout, container loading and shipping documents are issued before the container leaves the factory.

Request a quotation

Tell us the cable specification

Share the system voltage, conductor size, cable length, installation route, sheath or armour requirement and delivery destination. Our engineering team will reply within one business day.

This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.