IEC 62930 / EN 50618  ·  New Energy Cable Manufacturer
ZMS Cable logo
About ZMS Energy Cable

Energy cable company for PV, wind and storage projects

ZMS Cable has supplied cable and wire to industrial and infrastructure buyers since 1995. Our new energy team focuses on the cables that connect PV arrays, wind turbines and battery storage systems to the grid.

Home / About
Energy cable company ZMS - cable manufacturing floor in Zhengzhou
1995Manufacturing since
Company profile

Thirty years of cable engineering, one focused new energy range

ZMS Cable Group manufactures power, overhead, rubber, control and special cable from Zhengzhou, Henan Province. The group exports to more than 90 countries and supports industrial, utility and infrastructure projects.

This website is dedicated to renewable power generation cable: PV DC cable, wind turbine torsion cable, energy storage connection cable, MV collector cable, tracking and earthing cable. Products are built to IEC 62930, EN 50618 and IEC 60502, with project-specific conductor, screen, armour and sheath options.

  • Group manufacturing since 1995
  • 90+ export countries
  • 1500 V DC PV and 35 kV collector range
  • CE and ISO documentation
Download Company Profile
Milestones

A manufacturing base built over decades

1995

ZMS Cable founded

Started cable and wire manufacturing in Zhengzhou, Henan Province.

2000s

Export expansion

Built a sales network across the Middle East, Africa, Southeast Asia and Europe.

2010s

Full product range

Expanded into power, overhead, rubber, control and special cable.

Today

New energy focus

Dedicated PV, wind and storage cable engineering for renewable power projects.

What we control in-house

Conductor stranding, insulation, cabling, screening, armouring, sheathing and final inspection are managed through the production process. That gives us direct control over the details that decide UV life, torsion life and DC insulation integrity.

StrandingInsulationScreeningArmouringSheathingInspection

Quality documentation

CE, ISO 14001, ISO 45001, ISO/IEC 17020 and ISO/IEC 17025 documentation is available for project files.

View Certificates
Inside the plant

Production is a series of controlled checks

Every reel passes through conductor, insulation, cabling and final inspection stages. Wall thickness, screen coverage, armour dimensions and electrical performance are checked against the agreed specification before the drum is closed.

How we support your project

1. Specification review. We check system voltage, conductor size, screen, sheath and standard against the plant design.

2. Sample and data. Construction drawings, technical data and samples can be provided before the order.

3. Production and inspection. Cable is manufactured, tested, length-marked and packed for export.

4. Documentation. Packing list, inspection records and certificate copies are prepared for the project file.

Start a Specification Review
Cable production line with green cable on reels
Production line
Cable reels in the workshop before dispatch
Final check
Finished cable reels stored on the drum rack
Drum storage
Cable production hall at the Zhengzhou plant
Production hall
Reeling finished cable onto an export drum
Reeling and marking
Cable drums packed for export
Export packing
1 / 6Production, inspection and packing at the Zhengzhou plant
Engineering support

A new energy cable supplier should answer technical questions.

Send us the plant type and the design conditions. We will respond with a construction recommendation, not a generic catalogue page.